Difference between revisions of "User:RahalMccall69"

From eplmediawiki
Jump to: navigation, search
(Parkland teachers get 2.25 percent annual pay raises)
(Thurston County’s bridges to undergo inspections for new weight limits)
Line 1: Line 1:
 
+
@@@
Also new is a provision that allows employees who have coverage through another family member to opt out of Parkland's plan. In return, they'll receive a $1,500 stipend per year from the district for getting medical insurance elsewhere.The new pact gives teachers a one-time stipend of $3,500 if they receive National <a href=http://www.avanttravel.com/page.php?sale=Michael-Kors-Ballet-Flats>Michael Kors Ballet Flats</a>  Board Certification. Stipend salaries for coaches and clubs or activity advisers will also go up 2.25 percent each year. Sandi Gackenbach, president of the Parkland Education Association, said in a written statement that the contract was fair and that the members were pleased that it rewards staff for ongoing graduate study.School board members voted 8-0 for the agreement, with Director David Hein abstaining because his wife belongs to the teachers union. Board President Roberta Marcus called the contract covering <a href=http://www.alportico.net/page.php?sale=True-Religion-Jeans-Fake>True Religion Jeans Fake</a>  the union's 640 teachers, nurses, guidance counselors and other professional staff fair and fiscally responsible. The 2012-14 contract froze medical benefits for the first year, and in the second year teachers had to contribute to their health care for the first time: $30 per pay for family PPO coverage and up to $224 per month for family coverage under the Classic Blue Indemnity Plan.With the new contract, all employees will be paid through direct deposit, which will save <a href=http://www.radiorcs.com/page.php?sale=Jimmy-Choo-Uggs-Collection>Jimmy Choo Discount</a>  the district administrative, paper and processing costs.Mariella Miller is a freelance writer. Copyright 2014,
+
The U.S. Department of Transportation Federal Highway Administration is requiring local governments to evaluate their bridges for new load ratings by Dec. 2017, to ensure that the structures can handle modern vehicles that are designed to haul heavier loads. Thurston County Public Works is about a third of the way through checking those <a href=http://capstone.edu.sg/clreplicashoes.php>Christian Louboutin Shoes Sale</a>  weight limits on the 119 roadway bridges in its inventory, according to civil engineer Matt Unzelman.However, the county is going to hire an outside firm to do some of the inspections. The Board of County Commissioners voted 3-0 to hire Exeltech Consulting Inc. of Lacey to conduct that work on 10 structures, ranging from the Old Highway 101 Bridge to the Mud Bay Bridge.  Some of our more structurally complex bridges are included with these 10 bridges, Unzelman told The Olympian. We just need a different level of expertise. The ratings will determine if the county needs to add a weight limits to some of its structures, he said.County manager Cliff Moore described the work as routine, but said it s an important long-term process for the county.  Like most jurisdictions in the nation, we are trying to keep on this issue, he said. The money will come from the county s road fund, and will include the following structures. (Size and inspection information was listed in the county s 2014 Bridge Index.) &nbsp;James Road Bridge (culvert), known as J-1, which goes over an overflow channel, was built in 1985. The 25-foot-long structure was given a 98.19 sufficiency rating during an Aug. 8, 2012, inspection.  &nbsp;Littlerock Road Bridge, known as L-5, which goes over a ditch, was built in 1960. The 20-foot-long bridge was given a 49.66 rating during a Nov. <a href=http://www.museosangennaro.com/Public/wdluk.php>Christian Louboutin Shoes Sale</a>  21, 2013 inspection. Crews made some emergency repairs on the bridge this spring for scour and cracking. It is just down the road and the same design as the L-4 Bridge which is undergoing a complete replacement due to structural deficiencies.  &nbsp;Mud Bay Bridge, known as O-4, which goes over Mud Bay, was built in 1978. The 208-foot-long bridge was given a sufficiency rating of 77.02 during a Sept. 27, 2012 inspection. &nbsp;Old Highway 101 Bridge, known as O-3 which goes over Perry Creek, was built in 1958.The 105-foot-long bridge was given a sufficiency rating of 80.31 during a Sept. 14, 2012 inspection.  &nbsp;Oyster Bay Culvert, known as OB-1, which goes over Schneider Creek, was built in 2010. The 20-foot-long bridge was given a sufficiency rating of 85.8 during a June 12, 2012, inspection.  &nbsp;Steamboat Island Bridge, known as S-7, which goes over Totten Inlet, was built in 1982. <a href=http://www.museosangennaro.com/Public/anel.php> Christian Louboutin  Shoes Sale</a>  The 706-foot-long structure was given a sufficiency rating of 68.73 during a Sept. 14, 2012, inspection.  &nbsp;Holmes Island Bridge, known as H-3, which goes over Long Lake and was built in 1962. The 53-foot-long bridge, and was given a sufficiency rating of 54.26 during an Aug. 7, 2013 inspection. &nbsp;Nisqually Cutoff Bridge, known as N-1, which goes over an overflow channel, was built in 1936. The 92-foot-long structure was given a 74.48 sufficiency rating during an Oct. 4, 2012 inspection.  &nbsp;Old Pacific Highway Bridge, known as O-11, which goes over the Nisqually River was built in 1998. The 320-foot long structure was given a sufficiency rating of 95.38 during a Sept. 12, 2012 inspection.  &nbsp;Reservation Road Railroad Bridge, known as R-1, goes over a railroad and was built in 1993. The 331-foot-long bridge was given a sufficiency rating of 94.49 during an Aug. 9, 2013 inspection.

Revision as of 07:02, 1 October 2014

@@@ The U.S. Department of Transportation Federal Highway Administration is requiring local governments to evaluate their bridges for new load ratings by Dec. 2017, to ensure that the structures can handle modern vehicles that are designed to haul heavier loads. Thurston County Public Works is about a third of the way through checking those <a href=http://capstone.edu.sg/clreplicashoes.php>Christian Louboutin Shoes Sale</a> weight limits on the 119 roadway bridges in its inventory, according to civil engineer Matt Unzelman.However, the county is going to hire an outside firm to do some of the inspections. The Board of County Commissioners voted 3-0 to hire Exeltech Consulting Inc. of Lacey to conduct that work on 10 structures, ranging from the Old Highway 101 Bridge to the Mud Bay Bridge. Some of our more structurally complex bridges are included with these 10 bridges, Unzelman told The Olympian. We just need a different level of expertise. The ratings will determine if the county needs to add a weight limits to some of its structures, he said.County manager Cliff Moore described the work as routine, but said it s an important long-term process for the county. Like most jurisdictions in the nation, we are trying to keep on this issue, he said. The money will come from the county s road fund, and will include the following structures. (Size and inspection information was listed in the county s 2014 Bridge Index.)  James Road Bridge (culvert), known as J-1, which goes over an overflow channel, was built in 1985. The 25-foot-long structure was given a 98.19 sufficiency rating during an Aug. 8, 2012, inspection.  Littlerock Road Bridge, known as L-5, which goes over a ditch, was built in 1960. The 20-foot-long bridge was given a 49.66 rating during a Nov. <a href=http://www.museosangennaro.com/Public/wdluk.php>Christian Louboutin Shoes Sale</a> 21, 2013 inspection. Crews made some emergency repairs on the bridge this spring for scour and cracking. It is just down the road and the same design as the L-4 Bridge which is undergoing a complete replacement due to structural deficiencies.  Mud Bay Bridge, known as O-4, which goes over Mud Bay, was built in 1978. The 208-foot-long bridge was given a sufficiency rating of 77.02 during a Sept. 27, 2012 inspection.  Old Highway 101 Bridge, known as O-3 which goes over Perry Creek, was built in 1958.The 105-foot-long bridge was given a sufficiency rating of 80.31 during a Sept. 14, 2012 inspection.  Oyster Bay Culvert, known as OB-1, which goes over Schneider Creek, was built in 2010. The 20-foot-long bridge was given a sufficiency rating of 85.8 during a June 12, 2012, inspection.  Steamboat Island Bridge, known as S-7, which goes over Totten Inlet, was built in 1982. <a href=http://www.museosangennaro.com/Public/anel.php> Christian Louboutin Shoes Sale</a> The 706-foot-long structure was given a sufficiency rating of 68.73 during a Sept. 14, 2012, inspection.  Holmes Island Bridge, known as H-3, which goes over Long Lake and was built in 1962. The 53-foot-long bridge, and was given a sufficiency rating of 54.26 during an Aug. 7, 2013 inspection.  Nisqually Cutoff Bridge, known as N-1, which goes over an overflow channel, was built in 1936. The 92-foot-long structure was given a 74.48 sufficiency rating during an Oct. 4, 2012 inspection.  Old Pacific Highway Bridge, known as O-11, which goes over the Nisqually River was built in 1998. The 320-foot long structure was given a sufficiency rating of 95.38 during a Sept. 12, 2012 inspection.  Reservation Road Railroad Bridge, known as R-1, goes over a railroad and was built in 1993. The 331-foot-long bridge was given a sufficiency rating of 94.49 during an Aug. 9, 2013 inspection.

Personal tools
Namespaces

Variants
Actions
Navigation
extras
Toolbox